It has been a long time since my last update but I have made steady progress on the build. The electrical systems are now as done as they can be for this stage of the project. I put one wing on and then realized that it would be easier to set the wing alignment and incidence with both of them. Once these two critical tasks are completed, I can remove one wing and then position the fuselage as required to finish up the rest of the wing joining tasks.
It rained hard all weekend long which provided me with lots of free time to empty the welding area in my garage. With this area cleaned out I could move the fuselage into the centre of the garage and fit both wings with about 2 feet available at each wing tip. I have about 3 feet of space to play with in the welding area which will also allow for flap and aileron fitting.
This week I will work at leveling the aircraft in both directions in preparation for wing work. More pictures and text to follow.