Todays task was the fastening of the cowl hinges to the upper and lower cowl halves. Surfaces were scrubbed and sanded on the cowls and hinges. Epoxy resin was mixed with microspheres to make a slurry. This mixture buttered on the cowl surfaces where the hinges attach. Clecoed in place and then riveted for final attachment with flush rivets. The epoxy mixture oozed out of the holes I had drilled for that purpose. So far all is going according to plan. Tomorrow it will be back to work on the baffles